← All solutions
Textiles & Shelter

Tent & Shelter Sewing

Cut manageable fabric sections, sew and reinforce seams on two industrial machines, then apply fasteners before a final inspection.

Platform
40GP
Indicative build time
8–12 weeks
40GP GPFORGE Tent & Shelter Sewing module at a shelter logistics yard
shelter logistics yardAI concept illustration

Inside the module

Equipment layoutAI concept illustration
  1. Fabric and trim rack
  2. Fabric cutting table
  3. Industrial sewing station
  4. Industrial sewing station
  5. Fastener installation kit
  6. Inspection kit
  7. Finished fabric rack

Full-size panels and finished shelters need a separate layout or fit-up area. Confirm fabric width and seam specification before tooling.

Equipment at a glance

In the layoutQty
Fabric and trim rack2
Fabric cutting table1
Industrial sewing station2
Fastener installation kit1
Inspection kit1

Supporting scope

  • External fabric spread and fit-up area
  • Thread and seam tooling set

Plan this installation.

8–12 weeks indicative build window. Indicative build time after drawing approval and confirmation of key equipment availability. Freight, local approvals and site installation are scheduled separately.

Prepare an enquiry