Site Utility Modules
Compressed Air Service Station
Group compression, drying, air storage and distribution in one service module. The layout keeps the manifold accessible at the service end.
- Platform
- 20GP
- Indicative build time
- 8–12 weeks

Inside the module
- Air compressor
- Air dryer
- Air receiver
- Distribution manifold
- Service measurement kit
Size the equipment to site flow and pressure. Confirm ventilation, condensate handling and receiver inspection with the selected package supplier.
Equipment at a glance
| In the layout | Qty |
|---|---|
| Air compressor | 1 |
| Air dryer | 1 |
| Air receiver | 1 |
| Distribution manifold | 1 |
| Service measurement kit | 1 |
Supporting scope
- Ventilation and condensate handling
- Service isolation and hose connection kit
Plan this installation.
8–12 weeks indicative build window. Indicative build time after drawing approval and confirmation of key equipment availability. Freight, local approvals and site installation are scheduled separately.