Cardboard Baling

Sort and compact dry cardboard near the point of collection. A short bench, vertical baler and floor scale prepare manageable bales for separate staging.

Platform
20GP
Indicative build time
8–13 weeks
20GP GPFORGE Cardboard Baling module at a recycling yard
recycling yardAI concept illustration

Inside the module

Equipment layoutAI concept illustration
  1. Sorting bench
  2. Vertical cardboard baler
  3. Platform scale
  4. Strapping kit
  5. Inspection kit

Accept dry cardboard. Set aside space for bulk intake and finished bales, and confirm loading and collection routes.

Equipment at a glance

In the layoutQty
Sorting bench1
Vertical cardboard baler1
Platform scale1
Strapping kit1
Inspection kit1

Supporting scope

  • Bale strapping and handling kit
  • External covered bale staging

Plan this installation.

8–13 weeks indicative build window. Indicative build time after drawing approval and confirmation of key equipment availability. Freight, local approvals and site installation are scheduled separately.